SPECIFICATIONS

Shahr-e Rey 3 Solar Power Plant

The construction of this power plant with a capacity of 20MW started in 2024 with the use of bifacial panels and a single-axis detector structure.

Capacity
20MW
Location
Shahr-e Rey, Tehran Province
Investment
13m $
Area
30.8 Hectar
Technology
 Bifacial panels and single-axis solar tracking system  
Environmental Effects
14000 tons of CO2 emission reduction

The Main Activities of Taban Pasargad Company

  • Investment and construction of power plant
  • Management and supervision of power plant operation
  • Distribution and sale of electricity to the Ministry of Energy

Taban Energy Pasargad Industries Development Co.

@ 2019 by DNNGo Corp.

Contact Us

Free legal advice

+98 (21) 7971 7600

Email address:

infotaban@pedc.ir

Address:

Unit 515, Hamila Complex, No.38, Fallahnejad St., Pounak Square, Tehran, Iran


دی ان ان