The first phase of this solar power plant with a capacity of 2MW using Monofacial panels of 330KW, made by Jinko company and 75KW inverters, made by SMA company with fixed structure, was put into operation in 2021. The second phase of this power plant with a capacity of 8MW was built and put into operation within 6 months in 2022, using 540KW Bifacial panels made by JA company and 137KW inverters made by KACO company with solar tracking system.